Warranty: | 1 Year |
---|---|
Certification: | CE, ISO, SGS |
Voltage: | 380V |
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
Oil yied/day | Waste tire/ rubber | Big tyres | 45%--50% |
Car tyres | 40% | ||
Bicycles and motorcycles tyres | 30%--35% | ||
Waste plastic | Fishing net | 45%--50% | |
Safety net , farm-oriented film | |||
Conwenient bags , weave bags | 40% | ||
Off cut of recycled paper mill | 20%--30% |
Specification | Capacity | Raw material | Heating material | Working time (hrs) | Shipped by |
XHZT-2200-6000 | 5Ton | Waste tyres Cables Plastics Rubber Oil sludge |
Wood,coal ,oil,gas |
12 | 2*40HQ |
XHZT -2600-6000 | 8Ton | 15 | 1*40HQ+1*40FR | ||
XHZT -2600-6600 | 10Ton | 18 | 1*40HQ+1*40FR | ||
XHZT -2800-6000 | 10Ton | 18 | 1*40HQ+1*40FR | ||
XHZT -2800-6600 | 12Ton | 20 | 1*40HQ+1*40FR | ||
XHZT -2800-6600 | 15ton | Medical waste | 22 | 1*40HQ+1*40FR | |
Contiuous plant | 20Ton | Other waste | 24 | 3*40HQ | |
Contiuous plant | 60Ton | 24 | 5*40HQ |
model | Draft fan | speed reducer | water pump | oil pump | 4blowers |
2200*6000 | 4kw | 3kw | 1.5kw | 1.5kw | 1kw |
2200*6600 | |||||
2600*6000 | 7.5kw | 5.5kw | |||
2600*6600 | |||||
2800*6000 | |||||
2800*6600 |
1.Feed raw materials: The raw material can be waste tire/waste plastic/waste rubber. Always feed by the auto feeder. |
2.Pyrolysis: Include a reactor and catalyst room. Heat the reactor by coal/wood/oil/natural gas. This part will produce high temperature oil gas, the oil gas then flow into the next system. |
3. Condensing: Oil gas come out from the reactor and catalyst chamber then cooling down in this part. Condensing system include condenser pipe, oil water separator, horizontal condenser and waste gas condenser. This will make the oil yield to the maximum. |
4.Waste gas recovery: This part mainly deal with the gas that cannot be condensed. The whole process is very steady and high efficiency. |
5. Discharge: After finished oil produce, the temperature of reactor can be cooled down, When the temperature falls down to 40 degree then carbon black can be discharged automatically by the way of anticlockwise rotate the reactor. The carbon black will drop into slag pool and then use screw conveyor to clean the slag pool. After discharging the carbon black, we can discharge the steel wire. There is steel wire hook in the auto-feeder, we only need put the steel wire hook into the reactor, and start the motor, the steel wire can be pulled out easily, there is no need for workers to contact the reactor, it is very convenient. |
Suppliers with verified business licenses