Warranty: | 2 Years |
---|---|
Service Life: | 4-7 |
Certification: | CE, ISO |
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
1.The main parts of machine
1 |
Horizontal reactor |
2 |
Feeding raw material machine |
3 |
Sub-package |
4 |
Cooling dust system |
5 |
2nd remove dust chamber |
6 |
Heavy oil tank |
7 |
Oil and water separate tank |
8 |
Water cooling system |
9 |
Water sealing tank |
10 |
pressure & temperature gauge |
11 |
Electricity control system |
12 |
Condensation system |
13 |
Waste gas burning system |
14 |
Remove dust and sulphur system |
1. Tire crude oil usage( where need the oil as fuel)
A. power plant factory
B. glass factory
C. cement factory
D. ceramic factory
E. aluminum factory
F. boiler factory
G. central heating factory
H. painting factory
2. Carbon black usage
Until now our technology can process the carbon black into n330, which can be sold with higher price.
Suppliers with verified business licenses