Customization: | Available |
---|---|
Warranty: | 2 Years |
Service Life: | 4-7 |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
No | Item | Content | ||
1 | Reactor size | 2000×6600×16mm | 2600×6600×16mm | 2800×7500×18mm |
2 | Raw material | Waste tyre,waste plastic,waste rubber,waste oil,waste straw etc. | ||
3 | Structural form | Horizontal rotate | Horizontal rotate | Horizontal rotate |
4 | 24h handling capacity | 10T | 15T | 20T |
5 | Working pressure | Micro negative pressure | Micro negative pressure | Micro negative pressure |
6 | Reactor rotate speed | 0.4/min | 0.4/min | 0.4/min |
7 | Power | 16kw | 18kw | 20kw |
8 | Cooling model |
Coiled pipe cooling Condenser cooling Spray cooling |
Coiled pipe cooling Condenser cooling Spray cooling |
Coiled pipe cooling Condenser cooling Spray cooling |
9 |
Transmission model | Dual drive | Dual drive | Dual drive |
10 | Noise dB(A) | ≤85 | ≤85 | ≤85 |
11 | Heating method | Coal ,Gas,Fuel oil | Coal ,Gas,Fuel oil | Coal ,Gas,Fuel oil |
12 | Working form | intermittent | intermittent | intermittent |
13 | Install method | We send technician to guide the installation for free | We send technician to guide the installation for free | We send technician to guide the installation for free |
14 | Delivery time | Payment within 20 working days after payment. | ||
15 | Installation time | Internally within 20 days to complete the installation, commissioning, training, 25-30 days in foreign countries. | ||
16 | After-sale service | Free lifetime testing, maintenance, within 2 year of free major parts replacement. | ||
17 | Working life | 5 years | 5 years | 5 years |
Reactor |
1. Made of Q245R boiler steel. Also can choose Q345R 2. Auto-welding both inside and outside 3. With rock wool and first grade alumilum insulation board |
Auto-feeder |
1. 60 ton hydraulic pressure 2. Can feed all types of materials 3. Save labor and time |
Catalyst chamber |
1. improve oil yield and oil quality 2. Reduce the speed of oil gas so that it can be better cooled |
Oil-water separator |
1. Separate oil and water 2. Collect heavy oil 3. Water sealing design keep safety |
Condenser |
1. Include condenser pipe, horizontal condenser and waste gas condenser 2. The oil gas is cooled separately by small pipes inside condenser 3. Light oil is collected here |
Vacuum device |
1.Keep machine running under normal pressure 2.Have founction of keeping safe |
Anti-back fire device |
1. Recycle residual gas to furnace as fuel 2. Water sealing design prevent tempering |
Dust removal device |
Dispose of flue gas caused by using coal, wood, oil or natural gas. |
output |
usage |
crude oil(45%-55%) |
Burn as fuel oil : power plant factory Cement factory Boiler factory and so on Refine to diesel : Low speed engine like digging machine road roller loading machine and so on |
carbon black(30%-35%) |
Make carbon black bars through carbon black pellet machine as fuel grinding to Increase the mesh of carbon black to make new tyre ,painting and so on |
steel wire(10%) |
The steel wire from waste tyre can be re-sale to steel factory |
combustible gas(5%) |
recycled to heat the reactor as fuel.save energy |
Profit Analysis Report of waste tires oil extraction machine |
||
1set 10 tons capacity machine as sample |
||
NO. |
Iterm |
Cost of per batch |
1 |
10 tons of waste tire |
10T* 130$/T= 1300$ |
2 |
0.3 tons of caol |
0.3* 97.6$/T= 29.28$ |
3 |
water |
0.4$ |
4 |
electricity |
15.6$ |
5 |
workers |
4* 16.3$= 65.2$ |
total cost |
1410.48$ |
|
NO. |
Iterm |
Income |
1 |
Crude oil (40%-45%) |
10T* 40%* 715.5$/T= 2862$ |
2 |
Carbon black (30%-35) |
10T* 30%* 73$/T= 219$ |
3 |
Steel wire (10%-15%) |
10T* 10%* 300$/T= 300$ |
4 |
Gross profit |
3381$ |
5 |
Daily net profit |
1970.52$ |
6 |
Monthly net profit |
43351.44$ |
7 |
Yearly net profit |
433514.4$ |