Customization: | Available |
---|---|
Warranty: | 2 Years |
Service Life: | 4-7 |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1.The main parts of machine
1 |
Horizontal reactor |
2 |
Feeding raw material machine |
3 |
Sub-package |
4 |
Cooling dust system |
5 |
2nd remove dust chamber |
6 |
Heavy oil tank |
7 |
Oil and water separate tank |
8 |
Water cooling system |
9 |
Water sealing tank |
10 |
pressure & temperature gauge |
11 |
Electricity control system |
12 |
Condensation system |
13 |
Waste gas burning system |
14 |
Remove dust and sulphur system |
1. Tire crude oil usage( where need the oil as fuel)
A. power plant factory
B. glass factory
C. cement factory
D. ceramic factory
E. aluminum factory
F. boiler factory
G. central heating factory
H. painting factory
2. Carbon black usage
Until now our technology can process the carbon black into n330, which can be sold with higher price.